10. Solution of housing contractor profit maximization problem
Journal of Construction Engineering, Management & Innovation (Online)
, cilt.5, sa.4, ss.253-268, 2022 (TRDizin)
11. Scheduling, Management and Optimization of Construction Process
TEKNIK DERGI/TECHNICAL JOURNAL OF TURKISH CHAMBER OF CIVIL ENGINEERS
, cilt.33, sa.6, ss.12945-12986, 2022 (SCI-Expanded, Scopus, TRDizin)
13. Development of BIM software with quantity take-off and visualization capabilities
Journal of Construction Engineering, Management & Innovation (Online)
, cilt.5, sa.1, ss.1-14, 2022 (TRDizin)
14. Selection of Construction Machine bu Considering Time-Cost Trade-off Problem
Journal of Construction Engineering, Management & Innovation (Online)
, cilt.4, sa.3, ss.173-186, 2021 (TRDizin)
19. BAZI YEREL BENİRİZASYON YÖNTEMLERİ İLE BİNALARIN ISI KAYBINA YOL AÇAN KISIMLARIN BELİRLENMESİ.
Bilgisayar Bilimleri
, cilt.5, sa.1, ss.22-30, 2020 (TRDizin)
20. Development of preliminary structural analysis software
Journal of Structural Engineering & Applied Mechanics
, cilt.2, sa.4, ss.207-218, 2019 (Hakemli Dergi)
21. Comparison of resource distribution metrics on multi-resource projects
Journal of Construction Engineering, Management & Innovation (Online)
, cilt.2, sa.2, ss.93-102, 2019 (TRDizin)
23. Development of spreadsheet based quantity take-off and cost estimation application
Journal of Construction Engineering, Management & Innovation
, cilt.1, sa.3, ss.108-117, 2018 (Hakemli Dergi)
24. Estimation of duration of earthwork with backhoe excavator by MonteCarlo Simulation
Journal of Construction Engineering, Management & Innovation (Online)
, cilt.1, sa.2, ss.85-94, 2018 (TRDizin)
30. Development of a decision support system for the maintenance of water distribution network
PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI
, cilt.23, sa.9, ss.1049-1054, 2017 (ESCI, TRDizin)
33. KÜRÜME İÇİN KÜÇÜK ÖLÇEKLİ OTONOM İŞ MAKİNESİ TASARIMI VE ÜRETİMİ
Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi
, cilt.28, sa.3, ss.617-625, 2013 (SCI-Expanded, Scopus, TRDizin)
34. DESIGN AND MANUFACTURE OF A SMALL SCALE AUTONOMOUS CONSTRUCTION MACHINE FOR GRADING
JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY
, cilt.28, sa.3, ss.617-625, 2013 (SCI-Expanded, Scopus, TRDizin)
36. Prediction of Georeferencing Precision of Pushbroom Scanner Images
IEEE TRANSACTIONS ON GEOSCIENCE AND REMOTE SENSING
, cilt.50, sa.3, ss.831-838, 2012 (SCI-Expanded, Scopus)
37. Experimental Design for Genetic Algorithm Simulated Annealing for Time Cost Trade off Problems
International Journal of Engineering and Applied Sciences (IJEAS)
, cilt.3, sa.1, ss.15-26, 2011 (Hakemli Dergi)
38. ERROR ESTIMATION OF ORTHORECTIFICATION OF SMALL SATELLITE IMAGES BY DIFFERENTIAL SENSITIVITY ANALYSIS
Journal of Aeronautics and Space Technologies
, cilt.4, sa.4, ss.65-74, 2010 (Hakemli Dergi)
40. Kazı ve Hafriyat Sürelerindeki Belirsizliğin Monte Carlo Analizi ile Tahmini
Yüzüncü Yıl Üniversitesi Fen Bilimleri Enstitüsü Dergisi
, cilt.14, sa.2, 2009 (Hakemli Dergi)
Hakemli Bilimsel Toplantılarda Yayımlanmış Bildiriler
57
7. Optimum Solution of Resource Leveling Problem
7th International Project and Construction Management Conference (IPCMC2022), İstanbul, Türkiye, 20 Ekim 2022, cilt.1, ss.276-287, (Tam Metin Bildiri)
15. Fast and Accurate Preliminary Structural Analysis Software
International Civil Engineering and Architecture Conference, Trabzon, Türkiye, 17 - 20 Nisan 2019, cilt.1, ss.1683-1692, (Tam Metin Bildiri)
21. A Case Study For the Detection of the Problems of the Building Audit System:Şanlıurfa Province
Uluslararası Katılımlı 7. İnşaat Yönetimi Kongresi, Samsun, Türkiye, 6 - 07 Ekim 2017, cilt.1, ss.177-182, (Tam Metin Bildiri)
22. Determination of Search Domain of Resource Leveling Problem
Uluslararası Katılımlı 7. İnşaat Yönetimi Kongresi, Samsun, Türkiye, 6 - 07 Ekim 2017, cilt.1, ss.437-454, (Tam Metin Bildiri)
23. Economical Analysis of Heating of Buildings in Malatya Province
Uluslararası Katılımlı 7. İnşaat Yönetimi Kongresi, Samsun, Türkiye, 6 - 07 Ekim 2017, cilt.1, ss.257-270, (Tam Metin Bildiri)
24. Determination of the Complexity of the Resource Constrained Project Scheduling Problem
Uluslararası Katılımlı 7. İnşaat Yönetimi Kongresi, Samsun, Türkiye, 6 - 07 Ekim 2017, cilt.1, ss.455-466, (Tam Metin Bildiri)
25. Solution of Resource Constrained Project Scheduling by Line of Balance
Uluslararası Katılımlı 7. İnşaat Yönetimi Kongresi, Samsun, Türkiye, 6 - 07 Ekim 2017, cilt.1, ss.553-566, (Tam Metin Bildiri)
26. Solution of Time-cost Trade-off Problem by Spreadsheet Application
Uluslararası Katılımlı 7. İnşaat Yönetimi Kongresi, Samsun, Türkiye, 6 - 07 Ekim 2017, cilt.1, ss.423-436, (Tam Metin Bildiri)
27. PREDICTION OF ORBITAL DECAY OF LOW EARTH ORBIT SATELLITES
2nd International Science Symposium ISS2017, Tbilisi, Gürcistan, 5 - 08 Eylül 2017, cilt.1, ss.161-167, (Tam Metin Bildiri)
28. SOLUTION OF INDETERMINATE TRUSS STRUCTURES WITHOUT HUMAN INTERVENTION
2nd International Science Symposium ISS2017, Tbilisi, Gürcistan, 5 - 08 Eylül 2017, cilt.1, ss.168-174, (Tam Metin Bildiri)
29. Sınırlı Kaynaklı İş Programı Problemlerinin Arama Uzayının Belirlenmesi
4. Proje ve Yapım Yönetimi Kongresi, Eskişehir, Türkiye, 3 - 05 Kasım 2016, cilt.1, ss.211-219, (Tam Metin Bildiri)
30. Minimum Cost Design of Water Distribution Line with Differential Evolution Algorithm
International Symposium of Water and Wastewater Management, Malatya, Türkiye, 26 - 28 Ekim 2016, cilt.1, ss.391-398, (Tam Metin Bildiri)
31. Development of a Decision Support System for the Maintenance of Water Distribution Network
International Symposium of Water and Wastewater Management, Malatya, Türkiye, 26 - 28 Ekim 2016, cilt.1, ss.134-141, (Tam Metin Bildiri)
32. Cost Based Optimum Design of Water Distribution Network
International Symposium of Water and Wastewater Management, Malatya, Türkiye, 26 - 28 Ekim 2016, cilt.1, ss.1011-1017, (Tam Metin Bildiri)
33. Determination of Maximum Excavation Ratio of Scraper by Iteration
International Conference on Natural Science and Engineering (ICNASE’16), Kilis, Türkiye, 19 - 20 Mart 2016, cilt.1, ss.347-352, (Tam Metin Bildiri)
34. An Algorithm for the Orthorectification of Railway Images without Ground Control Point
International Conference on Natural Science and Engineering (ICNASE’16), Kilis, Türkiye, 19 - 20 Mart 2016, cilt.1, ss.339-344, (Tam Metin Bildiri)
38. Ölçüm Yöntemlerinin Maliyet ve Süre Gözönüne Alınarak Karşılaştırılması
3. Proje ve Yapım Yönetimi Kongresi, Antalya, Türkiye, 6 - 08 Kasım 2014, cilt.1, ss.913-921, (Tam Metin Bildiri)
39. Betonarme Binaların Kalite Kontrolünün Fotogrametri ve Uzaktan Algılama ile Sağlanması
3. Proje ve Yapım Yönetimi Kongresi, Antalya, Türkiye, 6 - 08 Kasım 2014, cilt.1, ss.922-929, (Tam Metin Bildiri)
40. OpenGL Tabanlı İş Programı ve 4D Modelleme Yazılımı Geliştirimi
3. Proje ve Yapım Yönetimi Kongresi, Antalya, Türkiye, 6 - 08 Kasım 2014, cilt.1, ss.263-269, (Tam Metin Bildiri)
42. Arbitration of Strengthening of Public Structures by Benefit Cost Analyses
Advances in Civil Engineering 2012, Ankara, Türkiye, 17 - 19 Ekim 2012, cilt.1, ss.1-9, (Tam Metin Bildiri)
43. Erciş Van Depremleri Sonrası Afet Yönetimi ve Öneriler
2. Proje ve Yapım Yönetimi Kongresi, İzmir, Türkiye, 13 - 16 Eylül 2012, cilt.1, ss.1077-1084, (Tam Metin Bildiri)
44. Elektrikli Otonom İş Makinelerinin Kullanılabilirliği
2. Proje ve Yapım Yönetimi Kongresi, İzmir, Türkiye, 13 - 16 Eylül 2012, cilt.1, ss.827-834, (Tam Metin Bildiri)
45. Özel Sektör Denetimindeki Altyapı Tesislerinin Afet Sonrası Onarımı
2. Proje ve Yapım Yönetimi Kongresi, İzmir, Türkiye, 13 - 16 Eylül 2012, cilt.1, ss.1029-1036, (Tam Metin Bildiri)
46. ASKERİ AMAÇLI İNSANSIZ KARA ARACI GELİŞTİRİLMESİ KÜÇÜK ÖLÇEKLİ PROTOTİP ÜRETİMİ
SAVTEK 2012, Ankara, Türkiye, 20 - 22 Haziran 2012
48. Construction Simulation for Cost and Duration Estimation
2nd International Symposium on Computing in Science and Engneering, İzmir, Türkiye, 1 - 04 Haziran 2011, cilt.1, ss.1237-1243, (Tam Metin Bildiri)
49. Coğrafi Bilgi Sistemleri ve Yapım Yönetimi Dalında Uygulama Alanları
Proje ve Yapım Yönetimi Kongresi PYYK1, Ankara, Türkiye, 29 Eylül - 01 Ekim 2010, cilt.1, ss.686-695
50. Modern Sezgisel Yöntemlerle Süre Maliyet Ödünleşim Probleminin Çözümü
Proje ve Yapım Yönetimi Kongresi PYYK1, Ankara, Türkiye, 29 Eylül - 01 Ekim 2010, cilt.1, ss.563-572
51. İş Makineleri Otomasyonunun Yapım Yönetimi Bakış Açısı ile İrdelenmesi
Proje ve Yapım Yönetimi Kongresi PYYK1, Ankara, Türkiye, 29 Eylül - 01 Ekim 2010, cilt.1, ss.47-60
52. Development of Mini Scale Autonomous Robot Grader for Road Constructions
International Workshop on Unmanned Vehicles, İstanbul, Türkiye, 10 - 12 Haziran 2010, cilt.1, ss.1-6
53. Estimation of Building Costs Using Geographic Information Systems
Fifth International Conference on Construction in the 21st Century (CITC-V), İstanbul, Türkiye, 20 - 22 Mayıs 2009, cilt.1, ss.99-106, (Tam Metin Bildiri)
55. BilSAT I Uydu Görüntüleri İçin Diferansiyel Rektifikasyon Parametrelerinin Düzeltilmesi
2. Uzaktan Algılama ve Coğrafi Bilgi Sistemleri Swmpozyumu, Kayseri, Türkiye, 13 - 15 Ekim 2008, cilt.1, (Tam Metin Bildiri)
56. Automated Cost Estimation of Dam Projects with Geographic Information Systems
8th International Congress on Advances in Civil Engineering, Gazimagusa, Kıbrıs (Kktc), 15 - 17 Eylül 2008, cilt.1, ss.557-561, (Tam Metin Bildiri)
57. Differential Sensitivity Analysis For The Accuracy Estimation Of Orthorectification Of Small Satellite Images
International Workshop On SMALL SATELLITES, NEW MISSIONS ANDNEW TECHNOLOGIES, İstanbul, Türkiye, 5 - 07 Haziran 2008
Kitaplar
4
3. İnşaat Mühendisleri için mühendislik ekonomisi genişletilmiş 2. baskı
İnönü Üniversitesi Yayınevi, Malatya, 2020
4. İnşaat Mühendisleri için Mühendislik Ekonomisi
İnönü Üniversitesi, Malatya, 2017